Contractor for the design and build of all civil works for a seven unit power generating station (two phases of construction 4x150MW – 3x150 MW).
Large quantities of excavation, shoring dewatering and reinforced concrete piling. The spill way structure includes deep excavation Extensive structural steel works, industrial floor, metal cladding & roofing.