DESCRIPTION
Design, Procurement, Supply, Installation, Construction, Inspection, Testing, Pre-commissioning, Commissioning and Hand-over of new Tank Vapour (TV) and High Pressure (HP) Air Assisted Smokeless flares along with all the piping.
Installation of the new flares, while utilizing the existing system, to provide standby flares for smokeless operation.